[Home ] [Archive]    
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Registration ::
Main Menu
Home::
Journal Information::
Articles archive::
Submission Instruction::
Registration::
Submit article::
Site Facilities::
Contact us::
::
Google Scholar

Citation Indices from GS

AllSince 2019
Citations93634163
h-index127
i10-index146

Search in website

Advanced Search
Receive site information
Enter your Email in the following box to receive the site news and information.
:: Volume 12, Issue 1 (6-2021) ::
IJOR 2021, 12(1): 49-63 Back to browse issues page
Delay scheduling based on discrete-event simulation for construction projects
Milad Abolghasemian * , Adel Pourghader Chobar , Mehdi AliBakhshi , Awrin Fakhr , Samaneh Moradi Pirbalouti
Islamic Azad University, Branch of Lahijan, Lahijan, Iran , m.abolghasemian.bt@gmail.com
Abstract:   (2335 Views)
Following the increasing growth of urbanization in recent decades in Iran, housing has become one of the most critical issues in the country. In this regard, mass production of housing has received more attention, and residential complexes can be considered a physical manifestation of the idea of mass housing in cities. Operational efficiency in residential construction production systems is evaluated based on average house completion time, the number of houses under construction, and processing time of activities. However, these systems are prone to non-uniformity problems and suspensions resulting from different variables, such as adverse weather conditions, workplace accidents, fluctuations in house demand, and rework. The purpose of this research is to show the effect of reprocessing on the manufacturing process.  In this study, the rework parameter and the variables of frequency, duration, and time of call-back have been considered. Also, the effects of these parameters on tangible performance criteria have been investigated. In this regard, we apply the combined approach of discrete-event simulation and computational modeling; then, we compare the results. Measurements show that the systems fragmented by repeated and short repetitions while referring to early are in optimal performance.
Keywords: Discrete-event Simulation, Computational Modeling, Rework, Call-back duration, Rework frequency and time
Full-Text [PDF 611 kb]   (7132 Downloads)    
Type of Study: Original | Subject: Mathematical Modeling and Applications of OR
Received: 2022/02/8 | Accepted: 2021/06/12 | Published: 2021/06/12
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML     Print



Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 12, Issue 1 (6-2021) Back to browse issues page
مجله انجمن ایرانی تحقیق در عملیات Iranian Journal of Operations Research
Persian site map - English site map - Created in 0.06 seconds with 39 queries by YEKTAWEB 4660