A Multi-objective Immune System for a New Bi-objective Permutation Flowshop Problem with Sequence-dependent Setup Times
|
|
|
|
چکیده: (40033 مشاهده) |
We present a new mathematical model for a
permutation flowshop scheduling problem with sequence-dependent setup times
considering minimization of two objectives, namely makespan and weighted mean
total earliness/tardiness. Only small-sized problems with up to 20 jobs can be
solved by the proposed integer programming approach. Thus, an effective
multi-objective immune system (MOIS) is specially proposed to solve the given
problem. Finally, the computational results are reported showing that the
proposed MOIS is effective in finding solutions of large-sized problems. |
|
|
|
متن کامل [PDF 228 kb]
(66241 دریافت)
|
نوع مطالعه: پژوهشی |
دریافت: 1392/3/31 | پذیرش: 1392/3/31 | انتشار: 1392/3/31
|
|
|
|
|
ارسال نظر درباره این مقاله |
|
|