[Home ] [Archive]    
:: Main :: About :: Current Issue :: Archive :: Search :: Submit :: Registration ::
Main Menu
Home::
Journal Information::
Articles archive::
Submission Instruction::
Registration::
Submit article::
Site Facilities::
Contact us::
::
Google Scholar

Citation Indices from GS

AllSince 2019
Citations86123637
h-index127
i10-index136

Search in website

Advanced Search
Receive site information
Enter your Email in the following box to receive the site news and information.
:: Volume 10, Issue 2 (9-2019) ::
IJOR 2019, 10(2): 18-39 Back to browse issues page
A Bi-objective Model for Cellular Manufacturing System Considering Worker Skills, Part Priorities,and Equipment Levels
Mahdi Saadat , Iraj Mahdavi , Mohammad Mahdi Paydar , Sara Firouzian
Babol Noshirvani University of Technology, , Paydar@nit.ac.ir
Abstract:   (5715 Views)
Here, a new mathematical model for cellular manufacturing systems considering three important features of part priority, levels of machine’s technology, and the operator’s skill is developed. Simultaneous consideration of these features provides a more realistic analysis of the problems in cellular manufacturing systems. A model with multiple design features including cell formation, human resources flexibility with different skills, machines flexibility, operational sequence, processing time, and the capacity of machine and manpower is proposed in this article. Ourfocus is on the design of cells to implementtwo dissimilar goals. The first goal is the reduction of inter-cellular movements of parts and workers. The second goal is the creation of efficient cellsby making cells quality level identical for produced products so that the production of all the different parts have good quality. Two approaches of augmented ε-constraint and non-dominated sorting genetic algorithm II (NSGA-II) are used to solve this model. By comparison of these two approaches, we realizethat the multi-objective evolutionary optimization algorithm creates a Pareto-optimal front in a reasonable amount of time forlarge-scale problems
Keywords: Cellular manufacturing system, Worker skills, Equipment levels, Part priorities, Augmented ε-constraint, NSGA-II
Full-Text [PDF 1010 kb]   (8480 Downloads)    
Type of Study: Original | Subject: Mathematical Modeling and Applications of OR
Received: 2019/08/4 | Accepted: 2019/10/8 | Published: 2019/12/1
Send email to the article author

Add your comments about this article
Your username or Email:

CAPTCHA


XML     Print



Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
Volume 10, Issue 2 (9-2019) Back to browse issues page
مجله انجمن ایرانی تحقیق در عملیات Iranian Journal of Operations Research
Persian site map - English site map - Created in 0.05 seconds with 39 queries by YEKTAWEB 4645